Thursday, August 20, 2009
Kitchen Reno - Part 4 - 100 Easy Pieces
IKEA delivered our kitchen on Tuesday. They called us a few weeks ago saying they had received it at the Calgary warehouse. They will store it up to 10 days, but after that they start charging you something like $20 per day.
We were surprised at how little stuff there is. Our whole new kitchen (not including new flooring, baseboards, and dishwasher) is in that room. It weighs 1000 lbs. And we have 7 days to confirm that everything was delivered. I started last night and I guess there is more stuff than I thought.
Next week and the countdown is on. The plumber comes next week to install shut-off valves on our sink. This will allow our contractor to install our sink when he installs our cabinets. The only concern I have is our water lines come in from the bottom of the cabinet (not from the back, like most sinks). We’ll have to drill holes in the sink cabinet bottom shelf and then lower it down overtop of the lines. We will also have the plumber get things ready for the dishwasher, which we will order this weekend.
The wife has a contact for a painter for our kitchen. After the bathroom, I don’t think she will ever paint again. We are going to try and match the blue on our IKEA dishes. It is a robin’s egg, or maybe powder, blue. The only problem we have is the front room and kitchen share a wall, so there isn’t an obvious place to stop painting. I think we’ve decided just to stop it at the edge of a doorway.
The last remaining question we have is whether to strip our floor before we put the new one down. There are two layers of vinyl floor in the kitchen, but one doesn’t go underneath the cabinets. When the new flooring is laid, there may be a bump near the new cabinets.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment